The 570 MW Wangchhu Hydro Electricity Project is located in Bhutan. It is Situated in the Chukha district on the Wangchu River. The Wangchhu Hydro Electricity project is a joint venture between Adani Power Limited and Druk Green Power Corporation Limited of Bhutan. The partnership ratio between Adani Power Limited and Druk Green Power Corporation Limited is 49% and 51% respectively. This project is set to be developed on a build, own, operate, transfer (BOOT) basis.

for this image credit goes to Power Technology
Here is some of the information in form of MCQs which will help to complete the information and enhance the knowledge. So let’s start the MCQ.
01) The 570 MW Wangchhu Hydro Electricity Project is located in which of the following country?
A) Myanmar
B) Bhutan
C) Nepal
D) China
Correct answer is option “B”
02) Why the 570 MW Wangchhu Hydro Electricity Project is in the news recently?
A) Because the project was officially announced
B) Because the construction of the project began in early 2026
C) Because it is a biggest deal of Adani Group
D) Because this project has become the solution to the problem of the power sector in India
Correct answer is option “B”
03) Why the 570 MW Wangchhu Hydro Electricity Project is located in which of the following district of Bhutan?
A) Bumthang
B) Dagana
C) Gasa
D) Chukha
Correct answer is option “D”
04) The 570 MW Wangchhu Hydro Electricity Project is being build on the Wangchu River. The Wangchu River is known by which of the following name in India?
A) Raidak River
B) Krishna River
C) Brahmaputra River
D) Ganga River
Correct answer is option “A”
05) Why the 570 MW Wangchhu Hydro Electricity Project is a Partnership between Druk Green Power Corporation of Bhutan and which of the following Indian company?
A) NHPC
B) Adani Power Ltd
C) Ambani Power Ltd
D) NTPC
Correct answer is option “B”
06) What is the partnership ration of the Adani Power Ltd in the Wangchhu Hydro Electricity Project?
A) 39%
B) 41%
C) 49%
D) 51%
Correct answer is option “C”
07) The 570 MW Wangchhu Hydro Electricity Project is set to be developed on which of the following basis?
A) BOOT Basis
B) BOAT Basis
C) BATH Basis
D) BAGH Basis
Correct answer is option “A”
08) What do you understand with the word BOOT from the following?
A) Buy, Own, Operate and Transfer
B) Build, Own, Operate and Transport
C) Build, Own, Operate and Transfer
D) Buy, Own, Operate and Transport
Correct answer is option “C”
09) What is the purpose behind to develop Wangchhu Hydro Electricity Project in Bhutan from the following?
A) To meet Bhutan’s winter electricity demand
B) To export surplus power to India in summer
C) Only option A
D) Option A & B both
Correct answer is option “D”
हिंदी में पढ़ने के लिए यहां क्लिक करें
To read more about the Current Affairs
| MCQs on Current Affairs for the month of January 2026 | CLICK HERE |
| MCQs on Current Affairs for the month of December 2025 | CLICK HERE |
| MCQs on Current Affairs for the month of November 2025 | CLICK HERE |
| MCQs on Current Affairs for the month of October 2025 | CLICK HERE |
| MCQs on Current Affairs for the month of September 2025 | CLICK HERE |
To read More and More……..
| To Read all the Blogs/Notes/Articles | CLICK HERE |
| To Read all the MCQs/Quiz | CLICK HERE |
| To Read All Blog/Notes/Article on Current Affairs | CLICK HERE |
| To Read All MCQs/Quiz on Current Affairs | CLICK HERE |
All the best for a Brightest Future